Chapter 9
10 sections.
- Ch.9 § 1-1Verified
BUILDING CODE
A. The Minnesota State Building Code, established pursuant to Minnesota Statutes 326B.101, including all of the amendments, rules and regulations established, adopted, and published from time to time by the Minnesota Commissioner of Administration, through the Building Codes and Standards Division is hereby adopted by reference as to the building code for this jurisdiction, excepting of the option…
- Ch.9 § 1-4Verified
BUILDING REGULATIONS · CONSTRUCTION HOURS
A. The erection (including excavation), demolition, alteration, or repair of any building shall occur only between the following hours: <table> <tr> <td>1.</td> <td>Monday through Saturday:</td> <td>7:00 AM to 10:00 PM</td> </tr> <tr> <td>2.</td> <td>Sunday:</td> <td>8:00 AM to 10:00 PM</td> </tr> </table> B. The Building Official may, in cases of emergency, grant permission to repair at any t…
- Ch.9 § 2-2Verified
BUILDING REGULATIONS · DEFINITIONS
A. Whenever the word "jurisdiction" is used in the Minnesota Uniform Fire Code, it shall be held to mean the City of Nowthen, Minnesota. B. Whenever the term "corporation counsel" is used in the Minnesota Uniform Fire Code, it shall be held to mean the City Attorney for the City of Nowthen, Minnesota. (Ordinance #39, adopted October 12, 2011)
- Ch.9 § 2-3Verified
BUILDING REGULATIONS · PERMITS AND INSPECTIONS
A. A permit required by the Fire Code shall be obtained by submission of an application to the Department of Building Safety along with any fee established in Section 1-2-2 of the City Code. B. Inspections as required by the Fire Code shall be scheduled by the City and shall require payment of any fee established in Section 1-2-2 of the City Code. (Ordinance #39, adopted October 12, 2011) <!-- P…
- Ch.9 § 3Verified
-9. Inspection Requirements
#### A. General. 1\. Any person performing inspections under this Section must be properly licensed or certified by the Minnesota Pollution Control Agency (MPCA) in accordance with Minnesota Rules 7083.0700 through 7083.2040. 2\. The Designated Building Official, or their designee, may conduct such inspections and reinspections as are necessary to determine compliance with this Section and appli…
- Ch.9 § 4-4Verified
BUILDING REGULATIONS · GRADING, DRAINAGE, AND EROSION CONTROL PLAN REQUIREMENTS
A. The Plan shall meet the criteria set forth in the most recent version of the Engineering Manual. B. Modifications to the Plan: 1\. Major amendments of the Grading, Drainage, and Erosion Control Plan shall be submitted to the City of Nowthen and shall be processed and approved, or disapproved, in the same manner as the original plans. 2\. Field modifications of a minor nature may be authorize…
- Ch.9 § 4-6Verified
BUILDING REGULATIONS · INSPECTION
A. The City Engineer shall make inspections as hereinafter required and shall either approve that portion of the work completed or shall notify the permitee wherein the work fails to comply with the Grading, Drainage, and Erosion Control Plan as approved. Plans for grading, stripping, excavating, and filling work bearing the stamp of approval of the City of Nowthen shall be maintained at the site …
- Ch.9 § 5-1Verified
BUILDING REGULATIONS
### PURPOSE: A. Land development projects and associated increases in impervious cover alter the hydrologic response of local watersheds and increase stormwater runoff rates and volumes, flooding, stream channel erosion, and sediment transport and deposition; B. Stormwater runoff contributes to increased quantities of water-borne pollutants; and, C. Stormwater runoff, soil erosion and nonpoint …
- Ch.9 § 5-6Verified
BUILDING REGULATIONS · DESIGN REQUIREMENTS FOR STORMWATER MANAGEMENT
Projects shall be designed in accordance with the most recent version of the Engineering Manual, the latest edition of the MN Stormwater Manual as published by the MPCA, and the following: A. Rate Control 1\. All projects will be required to control the rate of runoff from the site. Proposed discharge rates shall be equal to or less than the pre- development discharge rates for the 2-year, 10-ye…
- Ch.9 § 5-8Verified
BUILDING REGULATIONS · MAINTENANCE AND REPAIR REQUIREMENTS
A. Maintenance Easement: Prior to the issuance of any permit that has an stormwater management facility as one of the requirements of the permit, the applicant or owner of the site must execute a maintenance easement agreement that shall be binding on all subsequent owners of land served by the stormwater management facility. The agreement shall provide for access to the facility at reasonable tim…