Every dollar in any document
Loading records…
Loading records…
Cluster · other · no year
Top elevation of stormwater retention ponds.
Not promoted to the official baseline.
This cluster is useful evidence for review. It does not drive the budget simulator until an admin confirms the amount against an official source and promotes it.
Corroboration
1docs
Consensus
0%
Votes attached
0
Date range
2024-08-27 — 2024-08-27
Top elevation of stormwater retention ponds.
The high-water level elevation (HWL) for the proposed retention ponds is 934.01' while the top of the proposed ponds is 934.5'. Please revise the ponds such that they are designed in accordance with Standard Plate No. 410 as included in the City of Nowthen Engineering Manual.
Reasoning: Elevation is a key design parameter for stormwater infrastructure.