Every dollar in any document
Loading records…
Loading records…
Cluster · permit · no year
Maximum allowed accessory building square footage for outdoor storage on Parcel B (Phase 3) before Certificate of Occupancy.
Not promoted to the official baseline.
This cluster is useful evidence for review. It does not drive the budget simulator until an admin confirms the amount against an official source and promotes it.
Corroboration
2docs
Consensus
33%
Votes attached
0
Date range
2021-03-23 — 2021-03-23
Maximum allowed accessory building square footage for outdoor storage on Parcel B (Phase 3) before Certificate of Occupancy.
Planner Stockman reminded the commission about the City Code requirements that the 3.5 acres that are left in parcel B (Phase 3) needs to conform to the Accessory Building Requirements. Requesting Peterson to remove a building or two to meet the 3200 sq ft requirement in the interim. Later, as part of Phase 3 all the buildings will be removed, including the home.
Reasoning: This is a square footage requirement for accessory buildings, which is a regulatory threshold for permitting/occupancy.
Maximum allowed accessory building square footage for outdoor storage on Parcel B (Phase 3) before Certificate of Occupancy.
Motion by Schiller to approve 2 Conditional Use Permits, a Variance, Lot Reconfiguration, the Site Plan Review, and the Findings of Fact with these changes: - Wait for approval from the Fire Chief regarding turning radii, and buildings 6 & 9 are reduced in length if necessary - The applicant will work with Zoning Administrator on landscaping changes discussed - The east ends of all buildings in Phase 3 and the east ends of buildings 1 & 2 in Phase 2 be 100% Nova Brick - Accessory buildings are removed to get to a total of 3200 sq ft maximum to meet Parcel B (Phase 3) outdoor storage requirement
Reasoning: This is a regulatory maximum for accessory building area, relevant to permitting/occupancy.