Every dollar in any document
Loading records…
Loading records…
Cluster · other · no year
Minimum vertical soil separation required for septic system approval.
Not promoted to the official baseline.
This cluster is useful evidence for review. It does not drive the budget simulator until an admin confirms the amount against an official source and promotes it.
Corroboration
1docs
Consensus
0%
Votes attached
0
Date range
2024-04-23 — 2024-04-23
Minimum vertical soil separation required for septic system approval.
We reviewed the soil observation information presented to us and confirmed that there are currently two viable sites for Type I Septic Systems per lot (areas containing at least 12" of vertical soil separation to the limiting layer, as required in MN Rule 7080).
Reasoning: Not a dollar, but a regulatory dimension for septic approval.