Every dollar in any document
Loading records…
Loading records…
Cluster · other · no year
Required minimum lot width at front setback line.
Not promoted to the official baseline.
This cluster is useful evidence for review. It does not drive the budget simulator until an admin confirms the amount against an official source and promotes it.
Corroboration
1docs
Consensus
0%
Votes attached
0
Date range
2020-11-24 — 2020-11-24
Required minimum lot width at front setback line.
Additional lot depth is provided to ensure that the three hundred 300 foot required minimum lot width can be met at the front setback line.
Reasoning: Dimensional numeric figure, not a dollar, but included per instructions.