Every dollar in any document
Loading records…
Loading records…
Cluster · other · no year
Minimum number of soil borings required for road alignment.
Not promoted to the official baseline.
This cluster is useful evidence for review. It does not drive the budget simulator until an admin confirms the amount against an official source and promotes it.
Corroboration
1docs
Consensus
0%
Votes attached
0
Date range
2024-10-08 — 2024-10-08
Minimum number of soil borings required for road alignment.
Soil Borings are required (minimum of 3) in the location of the proposed road alignment to determine the suitability of the subgrade soils to support the proposed street.
Reasoning: Soil boring count is a quantifiable engineering requirement.