Every dollar in any document
Loading records…
Loading records…
Same dollar amount + same purpose + same year across multiple documents = ONE cluster. Each cluster is a fact; each cluster has a corroboration count (how many independent extractions point to it), and a click opens its evidence list and year-over-year siblings. 750 clusters total.
Clusters are mapped evidence, not approved budget lines.
Corroboration means the same number appears in multiple places. It still needs human review before the simulator can treat it as an official levy, fee, revenue, or expenditure.
750 matching clusters. Page 8 of 15.
| Amount | Category | Purpose | FY | Mentions | Consensus | Votes |
|---|---|---|---|---|---|---|
| $45,000 | capital | Estimated cost for tri-axle trailer replacement in 2028. Public Works | 2028 | 1 | 0% | — |
| $22,179 | capital | Purchase of a Lucas 3, V3.1 Chest Compression System and accessory equipment from Stryker Medical. | — | 1 | 0% | — |
| $4,500 | capital | Maximum authorized expenditure for 12 ADA park grills, piping, installation, and shipping. Capital Projects FundParks & Recreation | 2024 | 1 | 0% | — |
| $120,000 | capital | Amended council motion to approve purchase of truck and salter/sander, not to exceed $120,000. Public Works | — | 1 | 0% | — |
| $175,318 | capital | Payment for 2022 Microsurfacing Project. | 2022 | 1 | 0% | — |
| $490 | capital | Installation of TMTE stabilizer and safety props. | — | 1 | 0% | — |
| $22,500 | capital | 2023 budgeted purchase of fire turnout gear. | 2023 | 1 | 0% | — |
| $30,000 | capital | Estimated cost for park improvements at Memorial Park or Twin Lakes Parks in 2025. Capital Projects FundParks & Recreation | 2025 | 1 | 0% | — |
| $198 | capital | 7 contact RV socket installed on truck. | — | 1 | 0% | — |
| $585,500 | capital | Estimated cost for full depth reclamation and paving of Westpahl Country Acres in 2027. Road and Bridge FundPublic Works | 2027 | 1 | 0% | — |
| $15,000 | capital | Expenditure for turnout gear in 2030. Special Revenue Fund | 2030 | 1 | 0% | — |
| $258 | capital | Tungsten carbide insert blade for plow/wing (per unit). | — | 1 | 0% | — |
| $53,550 | capital | Estimated 2023 cost for Engren Addition (Lithium Street) bituminous overlay. Capital Projects Fund | 2023 | 1 | 0% | — |
| $594 | capital | TMTE pup hydraulic line with coupler and trip switch. | — | 1 | 0% | — |
| $30,644 | capital | Motor vehicles capital expenditure for Equipment Replacement in 2021. | 2021 | 1 | 0% | — |
| $120,000 | capital | 2028 replacement of Grass 1 (2008) fire engine. Public Safety — Fire | 2028 | 1 | 0% | — |
| $45,500 | capital | Remaining bond proceeds for fire tanker purchase. Fire FundPublic Safety — Fire | — | 1 | 0% | — |
| $-100,000 | capital | Decrease in capital expenditures over 2022. | 2023 | 1 | 0% | — |
| $323,600 | capital | Engren's Addition: Lithium St NW full depth reclamation and paving project. | 2029 | 1 | 0% | — |
| $784 | capital | Estimated 2026 Capital Improvement Project (CIP) cost for paved roads. Capital Projects Fund | 2026 | 1 | 0% | — |
| $1,300 | capital | Cost for casting assembly installation. Capital Projects Fund | 2024 | 1 | 0% | — |
| $249,280 | capital | Estimated 2026 cost for Hoffman Hills and Quiet Meadows bituminous overlay. Capital Projects Fund | 2026 | 1 | 0% | — |
| $6,937 | capital | Capital outlay for Recycling Center cameras. | — | 1 | 0% | — |
| $4,921 | capital | Purchase of radio for new tanker from Anoka County Treasurer. Public Safety — Fire | — | 1 | 0% | — |
| $243 | capital | Force low oil indicator system. | — | 1 | 0% | — |
| $446 | capital | Accessory air trip kit for dump body. | — | 1 | 0% | — |
| $391 | capital | Rubber belt deflector kit for plow. | — | 1 | 0% | — |
| $1,111 | capital | Cost for 15" RC apron installation on Waco Street. Capital Projects Fund | 2024 | 1 | 0% | — |
| $63,950 | capital | Funding total for Redpath Phase 1A - Alexa Example (2026). Capital Projects Fund | 2026 | 1 | 0% | — |
| $516 | capital | Total for two tungsten carbide insert blades for scraper. | — | 1 | 0% | — |
| $10,000 | capital | 2023 supplemental funding project element: implementing safety requirements. | 2023 | 1 | 0% | — |
| $250,000 | capital | Construction cost for detached ADU (two-story) in Seattle, WA. | 2014 | 1 | 0% | — |
| $164,795 | capital | Arvig's share (30%) of broadband extension project cost. | — | 1 | 0% | — |
| $595,400 | capital | City's share of costs for Waco Street, Waco Drive, 182nd Avenue & Ventre Lane Project. Capital Projects Fund | 2024 | 1 | 0% | — |
| $549 | capital | Removable sander/tailgate spill plates. | — | 1 | 0% | — |
| $5,000 | capital | Expenditure for turnout gear in 2029. Special Revenue Fund | 2029 | 1 | 0% | — |
| $837,334 | capital | 2020 actual streets and highway construction expenditures. Public Works | 2020 | 1 | 0% | — |
| $484 | capital | Reverse/auto-lift system for scraper. | — | 1 | 0% | — |
| $59,690 | capital | Total project cost for Redpath Phase 3C - JLM (2027). Capital Projects Fund | 2027 | 1 | 0% | — |
| $1,905 | capital | Purchase and installation of 33 new signs for the frisbee golf course and Twin Lakes Park. Capital Projects Fund | — | 1 | 0% | — |
| $352 | capital | Heavy duty hitch plate assembly for truck. | — | 1 | 0% | — |
| $31,000 | capital | Quote price for used Toro GM 4100 mower from MTI Distributing. | — | 1 | 0% | — |
| $4,449 | capital | Towmaster/Mailhot double acting hoist for truck. | — | 1 | 0% | — |
| $1,548 | capital | Installation of dump body to hoist. | — | 1 | 0% | — |
| $258 | capital | Tungsten carbide insert blade for scraper (per unit). | — | 1 | 0% | — |
| $301,000 | capital | Projected heavy machinery capital expenditure for Equipment Replacement in 2022. | 2022 | 1 | 0% | — |
| $29,500 | capital | Purchase of eight cameras, mounts, controls, and licenses for city security system. Capital Projects Fund | — | 1 | 0% | — |
| $30,000 | capital | 2023 Parks Capital Fund budget appropriation. Capital Projects Fund | 2023 | 1 | 0% | — |
| $57 | capital | Cost for 30 LF of silt fence installation. Capital Projects Fund | 2024 | 1 | 0% | — |
| $257,365 | capital | Total cost for purchase and upfitting of new Public Works truck. Capital Projects FundPublic Works | 2021 | 1 | 0% | — |