Every dollar in any document
Loading records…
Loading records…
Same dollar amount + same purpose + same year across multiple documents = ONE cluster. Each cluster is a fact; each cluster has a corroboration count (how many independent extractions point to it), and a click opens its evidence list and year-over-year siblings. 1,102 clusters total.
Clusters are mapped evidence, not approved budget lines.
Corroboration means the same number appears in multiple places. It still needs human review before the simulator can treat it as an official levy, fee, revenue, or expenditure.
1,102 matching clusters. Page 2 of 23.
| Amount | Category | Purpose | FY | Mentions | Consensus | Votes |
|---|---|---|---|---|---|---|
| $30 | other | Deadline for filing maintenance inspection/pumping report. | — | 1 | 0% | — |
| $18 | other | Defines the toe of the bluff as the lower point of a 50-foot segment with an average slope exceeding 18 percent. | — | 1 | 0% | — |
| $40 | other | Minimum parcel size for outdoor club recreation interim use in RRA district. | — | 1 | 0% | — |
| $1,500 | other | Number of residents reached for educational outreach. | — | 1 | 0% | — |
| $150 | other | Minimum lot frontage requirement in RRT district. | — | 1 | 0% | — |
| $15 | other | Minimum setback for driving or parking areas from lot line in RRA district. | — | 1 | 0% | — |
| $90 | other | Deadline for permittee to submit as-built mapping data after work completion. | — | 1 | 0% | — |
| $200 | other | Thickness in feet of the Eau Claire Formation. | — | 1 | 0% | — |
| $10 | other | Threshold for exemption from site development permit. | — | 1 | 0% | — |
| $30 | other | Timeframe for holding a hearing after request. | — | 1 | 0% | — |
| $15 | other | Time allowed to pay penalty or request hearing after citation. | — | 1 | 0% | — |
| $1,130 | other | Highest elevation in feet above mean sea level in the Upper Rum River Watershed. | — | 1 | 0% | — |
| $15 | other | Deadline for property owner response to code violation letter. | — | 1 | 0% | — |
| $46 | other | Maximum thickness in feet of the upper Wonewoc formation. | — | 1 | 0% | — |
| $30 | other | Minimum height above grade for detached decks to be considered accessory structures. | — | 1 | 0% | — |
| $6 | other | Maintenance period for restored public ground after gas facility work. | — | 1 | 0% | — |
| $200 | other | Tier depth for general development lakes (first tier, both sewered and unsewered). | — | 1 | 0% | — |
| $2 | other | Time allowed for vegetative erosion control to establish before further action. | — | 1 | 0% | — |
| $934 | other | Ordinary high water level for Burns Lake. | — | 1 | 0% | — |
| $1,000 | other | Minimum distance from school for cannabis cultivation interim use in RRA district. | — | 1 | 0% | — |
| $35 | other | Minimum front and rear yard setback from lot line in RRA district. | — | 1 | 0% | — |
| $30 | other | Deadline for submitting SSTS abandonment form. | — | 1 | 0% | — |
| $500 | other | Minimum setback for outdoor club recreation interim use in RRA district. | — | 1 | 0% | — |
| $35 | other | Area in square miles of Nowthen within the Upper Rum River Watershed. | — | 1 | 0% | — |
| $216 | other | Number of PTO hours accrued per year for employees hired after Nov 1st, 2023, years 8 to 9. | — | 1 | 0% | — |
| $180 | other | Maximum allowed days for exterior construction completion after permit issuance. | — | 1 | 0% | — |
| $150 | other | Minimum setback from centerline of collector or arterial roads in RRA district. | — | 1 | 0% | — |
| $1 | other | Validity period for maintenance (pumping) permits. | — | 1 | 0% | — |
| $75 | other | Minimum frontage for cul-de-sac lots in RRA district. | — | 1 | 0% | — |
| $200 | other | Maximum thickness in feet of the Tunnel City Group formation in the URRWMO. | — | 1 | 0% | — |
| $15 | other | Minimum setback for driving or parking areas from lot line in RRT district. | — | 1 | 0% | — |
| $899 | other | Ordinary high water level for Mud Lake. | — | 1 | 0% | — |
| $75 | other | Minimum frontage for cul-de-sac lots in RRT district. | — | 1 | 0% | — |
| $576 | other | Maximum size for internally/wet flood-proofed accessory structures in floodway. | — | 1 | 0% | — |
| $10 | other | Deadline to abate imminent threat from SSTS. | — | 1 | 0% | — |
| $175 | other | Minimum lot width at building setback line. | — | 1 | 0% | — |
| $30 | other | Dispute resolution timeline after mediation in franchise agreement. | — | 1 | 0% | — |
| $12 | other | Defines steep slopes as those with average slopes over 12 percent. | — | 1 | 0% | — |
| $500 | other | Minimum distance from public park attraction for cannabis cultivation interim use in RRA district. | — | 1 | 0% | — |
| $100 | other | Minimum thickness in feet of the Tunnel City Group formation in the URRWMO. | — | 1 | 0% | — |
| $50 | other | Defines the top of the bluff as the higher point of a 50-foot segment with an average slope exceeding 18 percent. | — | 1 | 0% | — |
| $3,080 | other | Acreage of mapped 500-year floodplain in the Upper Rum River Watershed. | — | 1 | 0% | — |
| $-243 | other | Unreconciled difference in bank reconciliation as of 2/28/2021. | 2021 | 1 | 0% | — |
| $667,000 | other | Deferred revenues as of December 31, 2024. | 2024 | 1 | 0% | — |
| $500 | other | Maximum tax credit for consumers installing Energy Star listed Reflective Roof systems. | — | 1 | 0% | — |
| $267 | other | Tier depth for general development lakes (second and additional tiers, unsewered). | — | 1 | 0% | — |
| $60 | other | Notice period before adoption of franchise fee ordinance. | — | 1 | 0% | — |
| $33 | other | Number of PTO days accrued per year for employees hired after Nov 1st, 2023, 14th anniversary and beyond. | — | 1 | 0% | — |
| $500 | other | Maximum size for floodproofed accessory structures (detached garage) in floodway. | — | 1 | 0% | — |
| $23 | other | Area in square miles of St. Francis within the Upper Rum River Watershed. | — | 1 | 0% | — |