Every dollar in any document
Loading records…
Loading records…
Same dollar amount + same purpose + same year across multiple documents = ONE cluster. Each cluster is a fact; each cluster has a corroboration count (how many independent extractions point to it), and a click opens its evidence list and year-over-year siblings. 1,102 clusters total.
Clusters are mapped evidence, not approved budget lines.
Corroboration means the same number appears in multiple places. It still needs human review before the simulator can treat it as an official levy, fee, revenue, or expenditure.
1,102 matching clusters. Page 4 of 23.
| Amount | Category | Purpose | FY | Mentions | Consensus | Votes |
|---|---|---|---|---|---|---|
| $10 | other | Interval for topographic contour mapping in PUD site plans. | — | 1 | 0% | — |
| $7,500 | other | Number of residents reached for educational outreach. | — | 1 | 0% | — |
| $30 | other | Dispute resolution timeline before mediation in franchise agreement. | — | 1 | 0% | — |
| $31 | other | Minimum allowed vertical separation for existing SSTS systems after reduction. | — | 1 | 0% | — |
| $3,611 | other | Size of house on residential lot. | — | 1 | 0% | — |
| $30 | other | Maximum height for non-farm and special uses in RRT district. | — | 1 | 0% | — |
| $30 | other | Maximum height for non-farm and special uses in RRA district. | — | 1 | 0% | — |
| $30 | other | Payment deadline for registrant to reimburse City for costs related to facility maintenance, support, or relocation. | — | 1 | 0% | — |
| $14 | other | Maximum period before stabilization is required for exposed soil. | — | 1 | 0% | — |
| $40 | other | Defines full-time employee threshold. | — | 1 | 0% | — |
| $35 | other | Area in square miles of Oak Grove within the Upper Rum River Watershed. | — | 1 | 0% | — |
| $7 | other | Maximum schedule for bringing noncomplying SSTS work into compliance unless extenuating circumstances. | — | 1 | 0% | — |
| $12 | other | Required maximum depth for manhole cover access. | — | 1 | 0% | — |
| $500 | other | Maximum size for internally floodproofed accessory structures in flood fringe. | — | 1 | 0% | — |
| $30 | other | Timeframe for refunding unused escrow after land use application action. | — | 1 | 0% | — |
| $300 | other | Minimum lot width and depth in RRA district. | — | 1 | 0% | — |
| $35 | other | Minimum front and rear yard setback from lot line in RRT district. | — | 1 | 0% | — |
| $2 | other | Minimum lot size for one family dwelling units in RRT district. | — | 1 | 0% | — |
| $10 | other | Deadline for SSTS upgrade/repair/replacement for imminent health threat. | — | 1 | 0% | — |
| $1 | other | Area in square miles of Bethel within the Upper Rum River Watershed. | — | 1 | 0% | — |
| $10 | other | Maximum recorded precipitation (inches) for June at St. Francis monitoring station. | — | 1 | 0% | — |
| $24 | other | Deadline for permittee to provide a cure plan after breach notification. | — | 1 | 0% | — |
| $60 | other | Automatic approval if City fails to act on application within 60 days. | — | 1 | 0% | — |
| $24 | other | Deadline for emergency pumping order after notice of failing system. | — | 1 | 0% | — |
| $50 | other | Defines the shore impact zone as a setback of 50 percent of the structure setback. | — | 1 | 0% | — |
| $50 | other | Defines the toe of the bluff as the lower point of a 50-foot segment with an average slope exceeding 18 percent. | — | 1 | 0% | — |
| $87 | other | Square footage equivalent for two-acre minimum lot size in RRT district. | — | 1 | 0% | — |
| $916 | other | Ordinary high water level for Pinnaker Lake. | — | 1 | 0% | — |
| $24 | other | Deadline for SSTS upgrade/repair/replacement for groundwater protection. | — | 1 | 0% | — |
| $60 | other | Deadline for City Engineer to act on site development permit application. | — | 1 | 0% | — |
| $15 | other | Deadline for registrant to update the City with changes to registration information. | — | 1 | 0% | — |
| $23,000 | other | Total wetland acreage in the watershed according to the National Wetland Inventory. | — | 1 | 0% | — |
| $30 | other | Deadline for owner to reimburse City for inspection costs. | — | 1 | 0% | — |
| $1,000 | other | Threshold for erosion/sedimentation control plan requirement for fill in flood fringe. | — | 1 | 0% | — |
| $60 | other | Deadline for CenterPoint Energy to file written acceptance of franchise. | — | 1 | 0% | — |
| $15 | other | Time allowed to correct or abate code violation after notice. | — | 1 | 0% | — |
| $10 | other | Threshold for requiring erosion and sediment control permit. | — | 1 | 0% | — |
| $176 | other | Number of households reached for educational outreach. | — | 1 | 0% | — |
| $30 | other | Possible extension for SSTS compliance due to weather/site conditions. | — | 1 | 0% | — |
| $267 | other | Tier depth for recreational development lakes (both sewered and unsewered). | — | 1 | 0% | — |
| $6 | other | Number of PTO hours accrued per pay period for employees hired after Nov 1st, 2023, years 3 to 5. | — | 1 | 0% | — |
| $15 | other | Deadline for submitting compliance inspection forms. | — | 1 | 0% | — |
| $4,000 | other | Number of residents reached for educational outreach. | — | 1 | 0% | — |
| $3 | other | Frequency for required maintenance inspections. | — | 1 | 0% | — |
| $917,709 | other | Amount over budget for interfund transfers from General Fund for 2018. | 2018 | 1 | 0% | — |
| $2 | other | Maximum allowable difference for vehicular access below regulatory flood protection elevation. | — | 1 | 0% | — |
| $20 | other | Minimum side yard setback from lot line in RRT district. | — | 1 | 0% | — |
| $933 | other | Estimated ordinary high water level for unnamed lake per DNR. | — | 1 | 0% | — |
| $6 | other | Variance for reduced side yard setback for storage facility construction. | — | 1 | 0% | — |
| $14 | other | Minimum overhead clearance for fire vehicle passage. | — | 1 | 0% | — |