Every dollar in any document
Loading records…
Loading records…
Same dollar amount + same purpose + same year across multiple documents = ONE cluster. Each cluster is a fact; each cluster has a corroboration count (how many independent extractions point to it), and a click opens its evidence list and year-over-year siblings. 1,102 clusters total.
Clusters are mapped evidence, not approved budget lines.
Corroboration means the same number appears in multiple places. It still needs human review before the simulator can treat it as an official levy, fee, revenue, or expenditure.
1,102 matching clusters. Page 5 of 23.
| Amount | Category | Purpose | FY | Mentions | Consensus | Votes |
|---|---|---|---|---|---|---|
| $1,499 | other | Legal description of property boundary (west 1499 feet). | — | 1 | 0% | — |
| $200,000 | other | Threshold for special permit requirement for very intense lighting: light source exceeding 200,000 initial luminaire lumens. | — | 1 | 0% | — |
| $0 | other | Checking account balance. | — | 1 | 0% | — |
| $3 | other | Minimum lot size for one family dwelling units in certain plats in RRA district. | — | 1 | 0% | — |
| $150 | other | Minimum setback from centerline of collector or arterial roads in RRT district. | — | 1 | 0% | — |
| $677,000 | other | Decrease in total city cash and investments compared to 2022. | — | 1 | 0% | — |
| $15 | other | Minimum setback for driving or parking areas from any lot line. | — | 1 | 0% | — |
| $1 | other | Administrative fee required as a percentage of total construction costs. | — | 1 | 0% | — |
| $2 | other | Percentage of city land zoned C-1 Commercial District. | — | 1 | 0% | — |
| $19,897 | other | Total acreage of Rural Residential Agriculture zoning in Nowthen. | — | 1 | 0% | — |
| $5 | other | Gross density requirement for certain subdivisions. | — | 1 | 0% | — |
| $14,962 | other | Difference in compensated absences between MWP and AEM audit reports. | 2018 | 1 | 0% | — |
| $102 | other | Minimum outside roadway diameter for cul-de-sac turnaround. | — | 1 | 0% | — |
| $10 | other | Variance requested from bufferyard requirement. | — | 1 | 0% | — |
| $2 | other | Minimum lot size and average density for one family dwelling units in RRT district. | — | 1 | 0% | — |
| $478 | other | Total acreage of Rural Residential Transition zoning in Nowthen. | — | 1 | 0% | — |
| $236 | other | Distance to west edge of second driveway. | — | 1 | 0% | — |
| $90 | other | Minimum setback from centerline of local road. | — | 1 | 0% | — |
| $960 | other | Minimum dwelling size for multi-level or split level homes. | — | 1 | 0% | — |
| $35 | other | Minimum front and rear yard building setback from any lot line (RRT district). | — | 1 | 0% | — |
| $16 | other | Minimum required driveway width for Carr's Tree Service site. | — | 1 | 0% | — |
| $60 | other | Maximum required monitoring period for groundwater elevation certification. | — | 1 | 0% | — |
| $-246,500 | other | 2021 budgeted change in fund balance for Equipment Replacement capital fund. Capital Projects Fund | 2021 | 1 | 0% | — |
| $150 | other | Minimum setback from centerline of collector or arterial roads. | — | 1 | 0% | — |
| $20 | other | Minimum side yard building setback from any lot line. | — | 1 | 0% | — |
| $0 | other | Impervious area before construction for Breyens Bend Residential Development. | — | 1 | 0% | — |
| $150 | other | Required street frontage for lot compliance. | — | 1 | 0% | — |
| $36 | other | Diameter of culvert required for replacement by county. | — | 1 | 0% | — |
| $3,200 | other | Size of one of the remaining sheds. | — | 1 | 0% | — |
| $5 | other | Maximum number of passenger/employee vehicles allowed on site by permit. | — | 1 | 0% | — |
| $82,125 | other | Reported fund summary balance for 2012A Refunding Bond Debt Service. | — | 1 | 0% | — |
| $36,600 | other | Reduced letter of credit for Woodhaven development project. | — | 1 | 0% | — |
| $63 | other | Additional paving needed to reach first driveway. | — | 1 | 0% | — |
| $132,984 | other | Reported checking account balance for 2020 Road Improvements. | — | 1 | 0% | — |
| $100 | other | Required buffer width between commercial and residential uses. | — | 1 | 0% | — |
| $14 | other | Minimum overhead clearance for emergency vehicle access. | — | 1 | 0% | — |
| $0 | other | Sales tax on RB Computer Service equipment purchase. | 2020 | 1 | 0% | — |
| $2 | other | Number of outlots created in Leistico plat. | — | 1 | 0% | — |
| $313 | other | Unclear; appears in a table or map annotation, possibly a survey or engineering reference. | — | 1 | 0% | — |
| $2,040 | other | Reference to the 2040 Land Use Plan in a zoning map update motion. | — | 1 | 0% | — |
| $24,480 | other | Example total initial luminaire lumens for 24x 18W LED fixtures in a compliance chart. | — | 1 | 0% | — |
| $7,000 | other | Performance method allowed base lumens per site for LZ2. | — | 1 | 0% | — |
| $280,130 | other | 2019 budgeted use of fund balance. General Fund | 2019 | 1 | 0% | — |
| $7 | other | End of allowed hours of operation. | — | 1 | 0% | — |
| $1,000 | other | Maximum length for permanent cul-de-sac street. | — | 1 | 0% | — |
| $247,840 | other | Example total initial luminaire lumens for a light commercial site in a prescriptive method compliance chart. | — | 1 | 0% | — |
| $117,800 | other | Reported fund summary balance for 2021A GO Improvement Bonds. | — | 1 | 0% | — |
| $23 | other | Current ordinance minimum lot area with 3 ft separation. | — | 1 | 0% | — |
| $8,000 | other | Reference to traffic volume at a site under discussion for a Conditional Use Permit. | — | 1 | 0% | — |
| $12 | other | Minimum driveway width required by ordinance. | — | 1 | 0% | — |