Every dollar in any document
Loading records…
Loading records…
Same dollar amount + same purpose + same year across multiple documents = ONE cluster. Each cluster is a fact; each cluster has a corroboration count (how many independent extractions point to it), and a click opens its evidence list and year-over-year siblings. 1,102 clusters total.
Clusters are mapped evidence, not approved budget lines.
Corroboration means the same number appears in multiple places. It still needs human review before the simulator can treat it as an official levy, fee, revenue, or expenditure.
1,102 matching clusters. Page 7 of 23.
| Amount | Category | Purpose | FY | Mentions | Consensus | Votes |
|---|---|---|---|---|---|---|
| $302 | other | Dimension of property boundary for legal description. | — | 1 | 0% | — |
| $0 | other | Net change by change orders for contract. | — | 1 | 0% | — |
| $22 | other | Width of greenhouse structure proposed for Crossroads School/Volunteers of America. | — | 1 | 0% | — |
| $7 | other | Number of offices planned in the house. | — | 1 | 0% | — |
| $23,000 | other | Minimum contiguous net buildable parcel size at proposed building site. | — | 1 | 0% | — |
| $700 | other | Size of one of the existing sheds to be removed. | — | 1 | 0% | — |
| $500 | other | Future parking requirement: one space per 500 square feet of building. | — | 1 | 0% | — |
| $51 | other | Standard paved cul-de-sac radius. | — | 1 | 0% | — |
| $100 | other | Buffer yard requirement for property setback. | — | 1 | 0% | — |
| $951,518 | other | Checks to be generated by the computer. | — | 1 | 0% | — |
| $220 | other | Total acreage of I-1 Industrial District zoning in Nowthen. | — | 1 | 0% | — |
| $21,000 | other | Performance method allowed base lumens per site for LZ4. | — | 1 | 0% | — |
| $2 | other | Gross land area requirement for platted lots (RRT Zoning). | — | 1 | 0% | — |
| $40 | other | Reported fund summary balance for Recycling Center. | — | 1 | 0% | — |
| $30 | other | Maximum height for non-farm and special use buildings. | — | 1 | 0% | — |
| $28 | other | Minimum street width for permanent cul-de-sacs after reduction. | — | 1 | 0% | — |
| $209,597 | other | Reported total checking account balance. | — | 1 | 0% | — |
| $4 | other | Minimum number of landscaping islands required for site plan. | — | 1 | 0% | — |
| $9,717 | other | Reported checking account balance for Recycling Center. | — | 1 | 0% | — |
| $970 | other | Size of one of the existing sheds to be removed. | — | 1 | 0% | — |
| $3 | other | Required vertical separation between final surface elevation and highest known water table. | — | 1 | 0% | — |
| $150 | other | Minimum frontage requirement for lots in RRT district. | — | 1 | 0% | — |
| $2 | other | Minimum soil separation for house structure in RRT District. | — | 1 | 0% | — |
| $20,000 | other | Required escrow for Toft Development First Addition. | — | 1 | 0% | — |
| $2 | other | Maximum number of accessory structures allowed on certain lots. | — | 1 | 0% | — |
| $300 | other | Septic system design flow for north building. | — | 1 | 0% | — |
| $300 | other | Minimum lot depth requirement. | — | 1 | 0% | — |
| $416,494 | other | Reported checks to be generated by the computer. | — | 1 | 0% | — |
| $3,200 | other | Maximum total floor area for accessory structures on certain lots. | — | 1 | 0% | — |
| $1 | other | Maximum period franchise fee may continue after franchise expiration. | — | 1 | 0% | — |
| $1,500,000 | other | Required minimum business automobile liability insurance coverage for contractor. | — | 1 | 0% | — |
| $700 | other | Size of accessory shed. | — | 1 | 0% | — |
| $219 | other | Total disputed material items between AEM and auditor for 2018 audit. | 2018 | 1 | 0% | — |
| $15 | other | Minimum lot area for house structure in RRT District. | — | 1 | 0% | — |
| $2,000,000 | other | Threshold for special permit requirement for very intense lighting: intensity in any direction of more than 2,000,000 candelas. | — | 1 | 0% | — |
| $6 | other | End of allowed hours for chipping/grinding. | — | 1 | 0% | — |
| $250 | other | Maximum distance from driveway or public street to all sides of principal structure for fire hose access. | — | 1 | 0% | — |
| $3 | other | Projected impervious area after construction for Breyens Bend Residential Development. | — | 1 | 0% | — |
| $35 | other | Application rate for infiltration basin seed mix 33-261 for site revegetation. | — | 1 | 0% | — |
| $55 | other | Unclear; appears in a table or map annotation, possibly a survey or engineering reference. | — | 1 | 0% | — |
| $130 | other | Required length of paved driveway from property line to gate. | — | 1 | 0% | — |
| $5 | other | Reference to a five year road plan estimate to be submitted by the engineer. | — | 1 | 0% | — |
| $94 | other | Percentage of city land zoned Rural Residential Agriculture. | — | 1 | 0% | — |
| $3,349 | other | Size of accessory shed. | — | 1 | 0% | — |
| $7 | other | Engineering escrow required as a percentage of security amount. | — | 1 | 0% | — |
| $90 | other | Variance distance for buffer between commercial and residential uses. | — | 1 | 0% | — |
| $23,000 | other | Minimum land area required for lot buildability standard. | — | 1 | 0% | — |
| $156 | other | Total acreage of Conservancy District zoning in Nowthen. | — | 1 | 0% | — |
| $3 | other | Minimum gross land area for newly created lots in certain subdivisions. | — | 1 | 0% | — |
| $250 | other | Maximum distance from driveway to structure for fire hose access. | — | 1 | 0% | — |