Every dollar in any document
Loading records…
Loading records…
Same dollar amount + same purpose + same year across multiple documents = ONE cluster. Each cluster is a fact; each cluster has a corroboration count (how many independent extractions point to it), and a click opens its evidence list and year-over-year siblings. 1,102 clusters total.
Clusters are mapped evidence, not approved budget lines.
Corroboration means the same number appears in multiple places. It still needs human review before the simulator can treat it as an official levy, fee, revenue, or expenditure.
1,102 matching clusters. Page 8 of 23.
| Amount | Category | Purpose | FY | Mentions | Consensus | Votes |
|---|---|---|---|---|---|---|
| $3 | other | Gross land area requirement for platted lots (RRA Zoning). | — | 1 | 0% | — |
| $200 | other | General fertilizer application rate recommendation for site preparation. | — | 1 | 0% | — |
| $600,000 | other | Reference value in general fund revenues figure. | — | 1 | 0% | — |
| $8 | other | Historical reference to original car lot size. | — | 1 | 0% | — |
| $100 | other | Dimension of property boundary for legal description. | — | 1 | 0% | — |
| $20 | other | Required buffer width along ditch. | — | 1 | 0% | — |
| $1,000 | other | Additional asphalt being added to the property. | — | 1 | 0% | — |
| $0 | other | No pre-written checks for August 2019. | 2019 | 1 | 0% | — |
| $24 | other | Maximum number of dealers possible at site. | — | 1 | 0% | — |
| $173 | other | Number of calls for service reported by the Sheriff's Office for July. | — | 1 | 0% | — |
| $450,000 | other | Letter of credit required as financial security for infrastructure improvements in Breyen's Bend. | — | 1 | 0% | — |
| $434 | other | Reported checking account balance for Grader Debt Service. | — | 1 | 0% | — |
| $44,222 | other | Reported checking account balance for General Fund. | — | 1 | 0% | — |
| $0 | other | Retainage on stored material. | — | 1 | 0% | — |
| $937 | other | Minimum lowest floor elevation required for building pad on Lot 2. | — | 1 | 0% | — |
| $-112,058 | other | Total journal entry payroll for all funds for June 2021. | — | 1 | 0% | — |
| $700 | other | Unclear; appears in a table or map annotation, possibly a survey or engineering reference. | — | 1 | 0% | — |
| $132 | other | Minimum property line diameter for cul-de-sac turnaround. | — | 1 | 0% | — |
| $120 | other | Maximum number of cars planned for car lot. | — | 1 | 0% | — |
| $192,000 | other | Example total initial luminaire lumens for 20x 150W Metal Halide fixtures in a compliance chart. | — | 1 | 0% | — |
| $13,465 | other | Retainage (5% of work completed) for 2019 Street Improvement Project. | — | 1 | 0% | — |
| $5 | other | Maximum lot size for accessory structure regulation. | — | 1 | 0% | — |
| $206,256 | other | 2024 projected ending fund balance for 2019A Improvement Bonds. Debt Service Fund | 2024 | 1 | 0% | — |
| $1 | other | Maximum height of building foundations exempt from facade material requirements. | — | 1 | 0% | — |
| $203 | other | Additional paving needed to reach second driveway. | — | 1 | 0% | — |
| $66 | other | Minimum right of way radius for cul-de-sac turnaround. | — | 1 | 0% | — |
| $30 | other | Number of residents notified for public hearing. | — | 1 | 0% | — |
| $3 | other | Minimum height for address sign required by permit. | — | 1 | 0% | — |
| $109,000,000 | other | Total settlement fund for Tyler v. Hennepin County, including claims, costs, and fees. | — | 1 | 0% | — |
| $220 | other | Application rate for standard seed mix 25-131 for site revegetation. | — | 1 | 0% | — |
| $1 | other | Minimum soil separation for yard area in RRT District. | — | 1 | 0% | — |
| $1 | other | Requirement for additional drainfield site per lot. | — | 1 | 0% | — |
| $96 | other | Distance from road center to west edge of first driveway. | — | 1 | 0% | — |
| $370 | other | Total acreage of C-1 Commercial District zoning in Nowthen. | — | 1 | 0% | — |
| $1 | other | Deadline for exercising interim use permit. | — | 1 | 0% | — |
| $150 | other | Security escrow required as a percentage of estimated construction costs. | — | 1 | 0% | — |
| $1,755 | other | Unclear; appears in a table or map annotation, possibly a survey or engineering reference. | — | 1 | 0% | — |
| $60 | other | Standard right of way dedication width. | — | 1 | 0% | — |
| $350 | other | Application rate for fertilizer 22-5-10 for site revegetation. | — | 1 | 0% | — |
| $3,640 | other | Size of garage on residential lot. | — | 1 | 0% | — |
| $1 | other | Percentage of city land zoned Conservancy District. | — | 1 | 0% | — |
| $71 | other | Unclear; appears in a table or map annotation, possibly a survey or engineering reference. | — | 1 | 0% | — |
| $4 | other | Minimum on-site presence required for dealer's license. | — | 1 | 0% | — |
| $30 | other | Maximum height for non-farm and special use buildings (RRT district). | — | 1 | 0% | — |
| $3,500 | other | Performance method allowed base lumens per site for LZ1. | — | 1 | 0% | — |
| $50 | other | Recommended width for ditch easement. | — | 1 | 0% | — |
| $2 | other | Gross land area and density requirements for unplatted land and minor subdivisions (RRT Zoning). | — | 1 | 0% | — |
| $1,200 | other | Minimum dwelling size for single level homes. | — | 1 | 0% | — |
| $11 | other | Unreconciled difference in bank reconciliation as of 6/30/2019. | — | 1 | 0% | — |
| $-9,698 | other | Unreconciled difference in bank reconciliation. | 2019 | 1 | 0% | — |