24,141 financial figures extracted across all council records, ordinances, and the city code. Each row carries the surrounding paragraph that explains the number, the page citation, and anAuto-extracted badge so you remember these are AI-extracted and ready for human review, not the official budget baseline.
Financial figure index, not official budget truth.
These rows are for discovery and audit. The simulator only uses rows promoted into the official budget baseline after an admin confirms the number against an official source.
Showing 301–350 of 2,605 figures.
| Amount | Category | Direction | Purpose | Where | Year |
|---|---|---|---|---|---|
| $421,528.31 · North Valley, Inc .: $421,528.31 (Base Bid) and $459,300.34 (Base Bid plus
Alternate) | estimate | out_from_city | overlay_north_valley_base_bid Bid received for the 2026 Overlay Project. Bucket: North Valley, Inc. base bid Auto-extracted | June 11, 2026 Packet p.3 Jun 11, 2026 | 2026 |
| $419,020 $419,020 | estimate | projected | 2023 budgeted amount for law enforcement contract. SOURCE OF FUNDING: This proposed 2023 city budget contains $419,020 for this purpose. General FundPublic Safety — Police / Sheriff ContractAuto-extracted | Meeting City Council Meeting — Agenda Packet (2022-09-13) p.2 Sep 13, 2022 | 2023 |
| $413,779.5 Duininck, Inc.
$413,779.50 | estimate | out_from_city | Duininck, Inc. bid Bid received from Duininck, Inc.; not the bid accepted in the packet resolution. Bucket: 2025 Overlay Project bids Auto-extracted | June 17, 2025 Packet p.2 Jun 17, 2025 | 2025 |
| $409,410 Public Works | 349,592 | 407,433 | 327,074 | 408,295 | 409,410 | 1,115 | 0.27% | estimate | out_from_city | FY2022 public works budget Proposed 2022 public works budget. Bucket: Public Works Auto-extracted | Meeting City Council Work Session — Agenda Packet (2021-09-1 Sep 13, 2021 | 2022 |
| $406,380 $406,380 General Fund Balance Use | estimate | out_from_city | 2026 General Fund balance use General fund balance use listed in the budget presentation. Bucket: General Fund Balance Use General FundAuto-extracted | Public Packet p.6 Dec 9, 2025 | 2026 |
| $403,480 $403,480 | estimate | projected | Total estimated cost for the 2025 overlay project. Engineer Nelson went over the 2025 feasibility report for the 2025 overlay project. He explained details regarding the project including which roads need patching, how the overlay will be 1.5 inches thick, and how he is not aware of any drainage issues. He also mentioned that the cost for patching is estimated at $37,400 and the estimate for the overlay is $366,080 with a total for the project being $403,480. Capital Projects FundPublic WorksAuto-extracted | Meeting City Council Meeting — Agenda Packet (2025-02-27) p.3 Feb 27, 2025 | 2025 |
| $403,480 $403,480 | estimate | projected | Total estimated cost for the 2025 overlay project. Engineer Nelson went over the 2025 feasibility report for the 2025 overlay project. He explained details regarding the project including which roads need patching, how the overlay will be 1.5 inches thick, and how he is not aware of any drainage issues. He also mentioned that the cost for patching is estimated at $37,400 and the estimate for the overlay is $366,080 with a total for the project being $403,480. Fifty percent of the project cost will be assessed to benefiting properties. Auto-extracted | Meeting Council Meeting — Minutes (2025-02-11) p.1 Feb 11, 2025 | 2025 |
| $403,480 the estimate
for the overlay is $366,080 with a total for the project being $403,480. | estimate | out_from_city | 2025 Overlay total project estimate stated in minutes Total project cost stated in the minutes as overlay plus patching. Bucket: 2025 Overlay project Auto-extracted | Meeting Council Meeting — Minutes (2025-02-11) p.1 Feb 11, 2025 | 2025 |
| $402,029 $402,029 | estimate | reference | Estimated total lease cost of a fire truck over 7 years. Cost of Delayed Truck Purchase $422,130 410,000 $402,029 390,000 Auto-extracted | Meeting City Council Meeting — Agenda Packet (2025-04-23) p.69 Apr 23, 2025 | — |
| $400,000 2021 - 1/2 Rogers Lake area - Estimate $400K | estimate | unknown | F8 Road and Bridge 5-year plan estimate for 2021 (1/2 Rogers Lake area). Auto-extracted | City Council Meeting — 2017-11-14 CC Packet (2017-11-14) Nov 14, 2017 | 2021 |
| $400,000 come back with
a plan of improvements of $400,000 per year with a 50% assessment
amount. | estimate | unknown | F6 Target annual improvements amount requested for the revised five-year road plan (council consensus direction to committee). Bucket: Five-year road improvement plan rework direction Road and Bridge FundAuto-extracted | City Council Workshop — 2017-11-09 Workshop Minutes (2017-11 p.6 Nov 9, 2017 | — |
| $400,000 Old Viking Blvd
was, at the time of that study, a $400,000 road. | estimate | out_from_city | F19 Mayor Pilon cited an earlier road-study estimate for Old Viking Blvd. Bucket: Old Viking Blvd earlier road-study estimate Road and Bridge FundAuto-extracted | Meeting City Council Public Hearing — Minutes (2019-05-14) p.6 May 14, 2019 | — |
| $400,000 She also noted
that she had projected the city would end 2026 approximately $150,000 under budget, primarily
due to unfilled staff positions, and that the city was expected to draw only approximately
$270,000 from its fund balance rather than the $400,000 originally anticipated - providing
sufficient budget flexibility to absorb the step increase costs. | estimate | out_from_city | projected_fund_balance_draw_original Originally anticipated 2026 fund-balance draw. Bucket: General Fund General FundAuto-extracted | May 19, 2026 Signed Minutes p.7 May 19, 2026 | 2026 |
| $400,000 that's probably going to leave us with maybe four hundred thousand dollars in our mind for any emergency | estimate | unknown | FF-30 Approximate remaining emergency reserve after proposed transfers, according to the treasurer’s caution. Bucket: Estimated emergency reserve remaining Auto-extracted | 2018 | |
| $400,000 $400,000 | estimate | historical | Historical estimate for Old Viking Blvd road project. Years ago, when the first road study was done, it was estimated that a basic upgrade, before they had deteriorated to where they are now, was estimated over $3 million dollars. Old Viking Blvd was, at the time of that study, a $400,000 road. Now it's an $800,000 road. Auto-extracted | Meeting City Council Public Hearing — Minutes (2019-05-14) p.6 May 14, 2019 | — |
| $400,000 we would be shooting for 400,000 for capital improvements for the next few years and to then to adjust the five-year plan based on that number | estimate | out_from_city | F1 Target amount discussed for capital improvements for the next few years while adjusting the five-year road plan. Bucket: Road capital improvements Road and Bridge FundAuto-extracted | 2018 | |
| $400,000 $400,000 | estimate | historical | Historical estimate for Old Viking Blvd road project. Old Viking Blvd was, at the time of that study, a $400,000 road. Now it's an $800,000 road. Auto-extracted | Meeting City Council Meeting — Agenda Packet (2019-06-11) p.20 Jun 11, 2019 | — |
| $396,208 · Knife River Corporation - North Central: $396,208.00 (Base Bid) and
$438,576.00 (Base Bid plus Alternate) | estimate | out_from_city | overlay_knife_river_base_bid Bid received for the 2026 Overlay Project. Bucket: Knife River Corporation - North Central base bid Auto-extracted | June 11, 2026 Packet p.3 Jun 11, 2026 | 2026 |
| $396,100 $396,100 | estimate | reference | Total of 10 year lease payments for a fire truck. Cost of Delayed Truck Purchase $38,884 $396,100 Total of 10 year lease payments Auto-extracted | Meeting City Council Meeting — Agenda Packet (2025-04-23) p.69 Apr 23, 2025 | — |
| $390,960 $390,960 | estimate | projected | Total estimated cost for the Jasper Street Improvement project. The 2019 construction cost has been estimated for the proposed Jasper Street Improvement project. The estimated costs are estimates only and are not guaranteed prices. The costs shown are estimates based on actual bid prices from projects of similar scope and adjusted for inflation. Auto-extracted | Meeting City Council Public Hearing and Special Meeting — Mi p.4 Jan 14, 2020 | 2019 |
| $390,960 $390,960 | estimate | projected | Projected total cost for Jasper Street Improvement project. The 2019 construction cost has been estimated for the proposed Jasper Street Improvement project. The estimated costs are estimates only and are not guaranteed prices. The costs shown are estimates based on actual bid prices from projects of similar scope and adjusted for inflation. Final contracts will be awarded on a unit price basis and the contractor will only be paid for work completed. It is assumed that this project will be bid concurrently with other similar projects, which is anticipated to reduce bid prices. The total estimated cost for this project is $390,960. It is proposed that the City will assess fifty percent of the total project costs to the benefitting properties. Auto-extracted | Meeting City Council Public Hearing and Special Meeting — Mi p.4 Jan 14, 2020 | 2019 |
| $390,960 $390,960 | estimate | projected | Estimated total project cost for Jasper Street Improvement Project. The 2019 construction cost has been estimated for the proposed Jasper Street Improvement project. The estimated costs are estimates only and are not guaranteed prices. The costs shown are estimates based on actual bid prices from projects of similar scope and adjusted for inflation. Final contracts will be awarded on a unit price basis and the contractor will only be paid for work completed. It is assumed that this project will be bid concurrently with other similar projects, which is anticipated to reduce bid prices. The total estimated cost for this project is $390,960. It is proposed that the City will assess fifty percent of the total project costs to the benefitting properties. Auto-extracted | Meeting City Council Meeting — Agenda Packet (2019-06-11) p.4 Jun 11, 2019 | 2019 |
| $390,960 The total estimated cost for this project is $390,960. It is
proposed that the City will assess fifty percent of the total project costs to the benefitting
properties. | estimate | out_from_city | Jasper Street total estimated project cost Total estimated project cost for Jasper Street. Bucket: Jasper Street feasibility study Road and Bridge FundAuto-extracted | Feasibility Report - Jasper p.4 Jun 11, 2019 | 2019 |
| $390,960 $ 390,960.00 | estimate | projected | Total estimated project cost for Jasper Street Improvement project. TOTAL ESTIMATED PROJECT COST $ 390,960.00 Auto-extracted | Meeting City Council Public Hearing and Special Meeting — Mi p.4 Jan 14, 2020 | 2019 |
| $390,960 The total estimated cost for this project is $390,960. It is
proposed that the City will assess fifty percent of the total project costs to the benefitting
properties. | estimate | out_from_city | F33 Total estimated project cost for the Jasper Street improvement. Bucket: Jasper Street total estimated project cost Road and Bridge FundAuto-extracted | Meeting City Council Public Hearing and Special Meeting — Mi Jan 14, 2020 | 2019 |
| $390,660 390,660 | estimate | projected | 2022 budgeted General Fund expenditure for Public Works. Public Safety 762,685 694,019 (68,666) Public Works 390,660 382,138 (8,522) General FundPublic WorksAuto-extracted | Meeting City Council Meeting — Agenda Packet (2023-07-11) p.7 Jul 11, 2023 | 2022 |
| $390,645.77 · Capital Paving: $390,645.77 (Base Bid) and $427,589.10 (Base Bid plus
Alternate) | estimate | out_from_city | overlay_capital_paving_base_bid Bid received for the 2026 Overlay Project. Bucket: Capital Paving base bid Capital Projects FundAuto-extracted | June 11, 2026 Packet p.3 Jun 11, 2026 | 2026 |
| $388,000 $388,000 | estimate | projected | Estimated total project cost for 189th Lane, 190th Lane & Dolomite Street improvement. Bids were obtained for this project from four reputable contractors on June 2, 2020. Based on those bids, the project costs came in at $388,000. There are 28 direct benefitting properties. The city would pay 50% of the project cost with an assessment of $6,928/unit. Auto-extracted | Meeting City Council Public Hearing — Minutes (2020-07-07) p.1 Jul 7, 2020 | 2020 |
| $387,420 There is also a
planned use of general fund balance of ($387,420). Total general fund
operating expenditure budgets are increasing by $14,340 in 2026. | estimate | in_to_city | planned use of general fund balance stated in memo Planned use of general fund balance stated in the budget memo. Bucket: proposed 2026 general fund General FundAuto-extracted | August 20, 2025 Packet p.4 Aug 20, 2025 | 2026 |
| $386,920 <td>USE OF FUND BALANCE</td>
<td>10,062</td>
<td></td>
<td></td>
<td>71,915</td>
<td>386,920</td>
<td>438.0%</td> | estimate | in_to_city | planned use of general fund balance shown in summary Use of fund balance shown in the General Fund Budget Summary. Bucket: proposed 2026 general fund General FundAuto-extracted | August 20, 2025 Packet p.6 Aug 20, 2025 | 2026 |
| $380,363 $380,363 | estimate | projected | Estimated cost for Ford Brook Estate 2nd addition road project in 2025. $380,363 Ford Brook Estate 2nd addition, (Erkium) 2025 Auto-extracted | Meeting City Council Work Session — Agenda Packet (2024-08-1 p.9 Aug 15, 2024 | 2025 |
| $380,000 City Engineer Shane Nelson gave an overview of road construction plan for 2025
keeping within the $380K budget allowed. | estimate | out_from_city | 2025 road construction budget allowed Budget limit discussed for the 2025 road construction plan. Bucket: 2025 road construction budget Road and Bridge FundAuto-extracted | Meeting City Council Meeting — Minutes (2025-01-14) p.1 Jan 14, 2025 | 2025 |
| $380,000 City Engineer Shane Nelson gave an overview of road construction plan for 2025
keeping within the $380K budget allowed. | estimate | out_from_city | F20 The January 14 minutes in the packet stated the 2025 road construction plan was within a $380K budget. Bucket: 2025 road construction budget referenced in January 14 minutes Road and Bridge FundAuto-extracted | Meeting City Council Meeting — Agenda Packet (2025-01-23) p.2 Jan 23, 2025 | 2025 |
| $380,000 Option 2, a smaller rescue unit with a pump on an F-550 chassis ($380,000), was
also acceptable. | estimate | out_from_city | F14 Approximate cost discussed for a smaller rescue unit with a pump on an F-550 chassis. Bucket: F-550 smaller rescue unit estimate Auto-extracted | July 8 2025 Signed Meeting Minutes p.3 Jul 8, 2025 | — |
| $376,000 If you look at our our cash control account right now, how much of it would you determine without policy? How much would you determine should be rolled over? There's $376,000 in there. | estimate | unknown | F-007 cash control account balance discussed During discussion of whether to transfer Road and Bridge funds, the mayor referred to $376,000 in the cash control account. Bucket: cash control account Auto-extracted | 2017 | |
| $366,500 Engineer's Estimate - The estimated construction cost for the project as designed is $366,500. The
estimated total project cost is $441,800. | estimate | out_from_city | Ebony and Garnet construction estimate Estimated construction cost for Ebony and Garnet project as designed. Bucket: Ebony and Garnet construction cost Auto-extracted | Meeting City Council Meeting — Agenda Packet (2021-04-13) Apr 13, 2021 | 2021 |
| $366,500 $366,500 | estimate | projected | Estimated construction cost for Ebony and Garnet Street improvement project. Engineer's Estimate - The estimated construction cost for the project as designed is $366,500. The estimated total project cost is $441,800. Auto-extracted | Meeting City Council Meeting — Agenda Packet (2021-04-13) p.2 Apr 13, 2021 | — |
| $366,080 > Engineer's Estimate for Overlay Improvement
$366,080 | estimate | out_from_city | F11 Engineer estimate for overlay improvements. Bucket: 2025 Overlay improvement estimate Auto-extracted | Meeting City Council Meeting — Agenda Packet (2025-03-11) p.34 Mar 11, 2025 | 2025 |
| $366,080 $366,080 | estimate | projected | Estimated cost for overlay as part of the 2025 overlay project. Engineer Nelson went over the 2025 feasibility report for the 2025 overlay project. He explained details regarding the project including which roads need patching, how the overlay will be 1.5 inches thick, and how he is not aware of any drainage issues. He also mentioned that the cost for patching is estimated at $37,400 and the estimate for the overlay is $366,080 with a total for the project being $403,480. Capital Projects FundPublic WorksAuto-extracted | Meeting City Council Meeting — Agenda Packet (2025-02-27) p.3 Feb 27, 2025 | 2025 |
| $366,080 $366,080 | estimate | projected | Engineer's estimate for overlay improvement as part of the 2025 Overlay Project. > Engineer's Estimate for Overlay Improvement $366,080 50% of Overlay Improvement cost proposed to be assessed to benefitting properties Capital Projects FundAuto-extracted | Meeting City Council Meeting — Agenda Packet (2025-03-11) p.34 Mar 11, 2025 | 2025 |
| $366,080 $366,080 | estimate | projected | Estimated cost for overlay as part of the 2025 overlay project. Engineer Nelson went over the 2025 feasibility report for the 2025 overlay project. He explained details regarding the project including which roads need patching, how the overlay will be 1.5 inches thick, and how he is not aware of any drainage issues. He also mentioned that the cost for patching is estimated at $37,400 and the estimate for the overlay is $366,080 with a total for the project being $403,480. Fifty percent of the project cost will be assessed to benefiting properties. Auto-extracted | Meeting Council Meeting — Minutes (2025-02-11) p.1 Feb 11, 2025 | 2025 |
| $366,080 the estimate
for the overlay is $366,080 with a total for the project being $403,480. | estimate | out_from_city | 2025 Overlay feasibility report estimated project cost Estimated overlay project cost in the feasibility report and minutes. Bucket: 2025 Overlay project Auto-extracted | Meeting Council Meeting — Minutes (2025-02-11) p.1 Feb 11, 2025 | 2025 |
| $364,652 $364 652 | estimate | reference | Estimated total lease cost of a fire truck over 9 years. Cost of Delayed Truck Purchase $396,100 Total of 10 year lease payments 370,000 $364 652 350,000 Auto-extracted | Meeting City Council Meeting — Agenda Packet (2025-04-23) p.69 Apr 23, 2025 | — |
| $362,915 $362,915 | estimate | reference | Total of 7 year lease payments for a fire truck. Cost of Delayed Truck Purchase $347 288 $362,915 Total of 7 year lease payments Auto-extracted | Meeting City Council Meeting — Agenda Packet (2025-04-23) p.69 Apr 23, 2025 | — |
| $361,583 OMG Midwest Inc. dba Minnesota Paving and Materials
$361,583.00 | estimate | out_from_city | OMG Midwest Inc. dba Minnesota Paving and Materials bid Bid received from OMG Midwest Inc. dba Minnesota Paving and Materials; not the bid accepted in the packet resolution. Bucket: 2025 Overlay Project bids Auto-extracted | June 17, 2025 Packet p.2 Jun 17, 2025 | 2025 |
| $360,000 Comparing it to bonding and holding the equipment over 20
years, the lease with trade in after 10 years would cost the city approximately
$360,000 more over 20 years. | estimate | out_from_city | Additional cost of dump truck lease/trade-in option Estimated additional 20-year cost of leasing and trading in versus bonding and holding the dump truck. Bucket: Equipment Replacement Capital Projects FundAuto-extracted | May 28, 2026 Packet p.10 May 28, 2026 | — |
| $356,654 $356,654 | estimate | projected | Estimated cost for Burns Country Estates road project in 2027. $356,654 Burns Country Estates (194th) 2027 Auto-extracted | Meeting City Council Work Session — Agenda Packet (2024-08-1 p.9 Aug 15, 2024 | 2027 |
| $353,800 PUBLIC HEARING FOR PROPOSED 2020 ROAD IMPROVEMENT TO 189TH LANE, 190TH LANE
& DOLOMITE STREET - Preliminary Estimate $353,800 | estimate | unknown | FF-2 Preliminary estimate for proposed 2020 road improvement to 189th Lane, 190th Lane & Dolomite Street. Bucket: Road improvements (proposed) Road and Bridge FundAuto-extracted | Meeting City Council Public Hearing — Minutes (2020-02-13) p.2 Feb 13, 2020 | 2020 |
| $353,800 $353,800 | estimate | projected | Preliminary estimate for the 2020 road improvement project to 189th Lane, 190th Lane & Dolomite Street. PUBLIC HEARING FOR PROPOSED 2020 ROAD IMPROVEMENT TO 189TH LANE, 190TH LANE & DOLOMITE STREET - Preliminary Estimate $353,800 Public hearing opened at 6:58 pm Engineer Nelson began by explaining that Nowthen maintains 34 miles of paved roads and 29 miles of gravel roads. Auto-extracted | Meeting City Council Public Hearing — Minutes (2020-02-13) p.3 Feb 13, 2020 | 2020 |
| $353,800 $353,800 | estimate | projected | Preliminary estimate for 2020 road improvement project to 189th Lane, 190th Lane & Dolomite Street. PUBLIC HEARING FOR PROPOSED 2020 ROAD IMPROVEMENT TO 189TH LANE, 190TH LANE & DOLOMITE STREET - Preliminary Estimate $353,800 Public hearing opened at 6:58 pm Engineer Nelson began by explaining that Nowthen maintains 34 miles of paved roads and 29 miles of gravel roads. This project is just shy of one mile. This pavement was originally constructed in 1993. Pavement is designed to last 20 years. The estimate is $353,800. Auto-extracted | Meeting City Council Public Hearing — Minutes (2020-02-13) p.2 Feb 13, 2020 | 2020 |