2026-05-27
Packet
Not posted
The supporting materials council reviewed.
Minutes
Not posted
The official record of what happened.
Agenda items below are drawn from the packet; outcomes will not appear until minutes are added.
One-line summary
The Veterans Memorial Renovation Committee agenda focused on design, project estimates, contractor coordination, donations, and next meetings, with packet estimates showing a preliminary $50,900 final project cost but no minutes showing decisions.
6 items as recorded in the packet and minutes.
1Design Review
minutes not available in this bundle
2Project Estimate
minutes not available in this bundle
3Volunteer to assist with coordinating contractors
minutes not available in this bundle
4Donation Process - who will lead
minutes not available in this bundle
5Next Meetings
minutes not available in this bundle
6Adjourn
minutes not available in this bundle
What this meeting did about specific topics, organized by issue rather than by document.
Veterans Memorial renovation planning and cost estimate
The committee agenda called for design review, review of the project estimate, finding a volunteer to help coordinate contractors, deciding who would lead the donation process, and setting next meetings. The packet included a preliminary cost sheet showing $57,560.00 in materials/labor, $7,620.00 in donations, and a $50,900.00 final cost, plus supporting estimates from All Terrain Fabrication, Fallon Construction, TrueNorth Flag & Flagpoles, Two Rivers Monuments, and Weiss Electric. Because no minutes were included, the record does not show what was decided at the meeting.
Agenda: 1, 2, 3, 4, 5.
Adjournment
Adjournment was listed as the final agenda item, but no minutes were included to show when the meeting ended or whether any formal adjournment motion was made.
Agenda: 6.
Each figure links back to the document it came from. When the council voted on the amount, the motion is shown.
All Terrain Fabrication preliminary materials/labor
Preliminary cost sheet materials/labor amount for All Terrain Fabrication.
estimate · All Terrain Fabrication
$4,022
outflow
Council approval status: not yet on record.
All Terrain Fabrication preliminary donation
Preliminary cost sheet donation amount for All Terrain Fabrication; this conflicts with the vendor estimate.
donation · All Terrain Fabrication
$3,620
inflow
Council approval status: not yet on record.
All Terrain Fabrication final cost / estimate total
Preliminary cost sheet final cost for All Terrain Fabrication.
estimate · All Terrain Fabrication
$1,372
outflow
Council approval status: not yet on record.
All Terrain Fabrication labor donation in vendor estimate
Vendor estimate states All Terrain Fabrication would donate labor for CAD, fabrication, and installation.
donation · All Terrain Fabrication
$2,650
inflow
Council approval status: not yet on record.
Fallon Construction preliminary materials/labor
Preliminary cost sheet materials/labor amount for Fallon Construction.
estimate · Fallon Construction
$26,150
outflow
Council approval status: not yet on record.
Fallon Construction donation / discount
Donation or discount shown for Fallon Construction.
donation · Fallon Construction
$4,000
inflow
Council approval status: not yet on record.
Fallon Construction final cost / estimate total
Final cost / total estimate for Fallon Construction.
estimate · Fallon Construction
$22,150
outflow
Council approval status: not yet on record.
Fallon Construction base concrete
Fallon Construction base concrete line item for the City of Nowthen Veterans Memorial.
estimate · Fallon Construction
$18,650
outflow
Council approval status: not yet on record.
Fallon Construction raised flagpole areas
Fallon Construction raised area around flagpoles line item total.
estimate · Fallon Construction
$7,500
outflow
Council approval status: not yet on record.
TrueNorth Flag & Flagpoles preliminary cost
Preliminary cost sheet materials/labor and final cost for TrueNorth Flag & Flagpoles.
estimate · TrueNorth Flag & Flagpoles
$14,000
outflow
Council approval status: not yet on record.
TrueNorth 5-inch pole deduct alternate
Preliminary cost sheet alternate deduct if 5-inch diameter poles are chosen.
estimate · TrueNorth Flag & Flagpoles
$2,340
unknown
Council approval status: not yet on record.
TrueNorth 6-inch anodized pole unit price
True North bid price per 25-foot anodized pole in the 6-inch diameter version.
estimate · TrueNorth Flag & Flagpoles
$4,900
outflow
Council approval status: not yet on record.
TrueNorth 5-inch pole unit price
True North bid price per 25-foot pole in the 5-inch diameter version.
estimate · TrueNorth Flag & Flagpoles
$3,730
outflow
Council approval status: not yet on record.
TrueNorth delivery and pole installation without ground sleeves
True North delivery, assembly, and installation cost if others install the ground sleeves.
estimate · TrueNorth Flag & Flagpoles
$1,800
outflow
Council approval status: not yet on record.
TrueNorth complete installation for two poles
True North complete installation cost for two poles if the vendor also installs ground sleeves.
estimate · TrueNorth Flag & Flagpoles
$3,200
outflow
Council approval status: not yet on record.
Two Rivers Monuments preliminary materials/labor
Preliminary cost sheet materials/labor amount for Two Rivers Monuments.
estimate · Two Rivers Monuments
$9,788
outflow
Council approval status: not yet on record.
Two Rivers Monuments preliminary final cost
Preliminary cost sheet final cost for Two Rivers Monuments; this differs from the underlying estimate in the bundle.
estimate · Two Rivers Monuments
$9,778
outflow
Council approval status: not yet on record.
Two Rivers Monuments estimate total
Two Rivers Monuments estimate total in the vendor estimate document.
estimate · Two Rivers Monuments
$9,038
outflow
Council approval status: not yet on record.
Two Rivers stone setting and pin holes
Two Rivers line item for stone setting and holes drilled for pins.
estimate · Two Rivers Monuments
$1,500
outflow
Council approval status: not yet on record.
Two Rivers five polished granite bases
Two Rivers line item for five black granite polished bases.
estimate · Two Rivers Monuments
$3,438
outflow
Council approval status: not yet on record.
Two Rivers Travis Geigner saw and repolish
Two Rivers line item for Travis Geigner saw and repolish.
estimate · Two Rivers Monuments
$1,500
outflow
Council approval status: not yet on record.
Two Rivers relettering
Two Rivers line item for relettering each face of stone.
estimate · Two Rivers Monuments
$2,600
outflow
Council approval status: not yet on record.
Weiss Electric electrical work and lighting estimate
Preliminary cost sheet and Weiss Electric estimate total for electrical work and lighting.
estimate · Weiss Electric
$3,600
outflow
Council approval status: not yet on record.
Preliminary project materials/labor total
Preliminary cost sheet total materials/labor for the Veterans Memorial renovation.
estimate · Preliminary project total
$57,560
outflow
Council approval status: not yet on record.
Preliminary project donation total
Preliminary cost sheet total donations, though the vendor-level donation figures appear inconsistent.
donation · Preliminary project donations
$7,620
inflow
Council approval status: not yet on record.
Preliminary project final cost total
Preliminary cost sheet total final cost for the Veterans Memorial renovation.
estimate · Preliminary project final cost
$50,900
outflow
Council approval status: not yet on record.
Every document and recording archived for this meeting.
project_estimate_costs_5.7.2026.xlsx
Document · 2026-05-27
1 pages
nowthen_memorial_estimate_3.3.2026.docx
Document · 2026-05-27
1 pages
true_north_flag_bid_3.5.2026.docx
Document · 2026-05-27
1 pages
May 27, 2026 Agenda
Agenda · 2026-05-27
1 pages
estimate_1123_from_fallon_construction_services_3.10.2025.pdf
Document · 2026-05-27
2 pages
04.13.2026_estimate_-_750_added_later.pdf
Document · 2026-05-27
1 pages
estimate_3680_from_all_terrain_fabrication_llc_3.10.2025.pdf
Document · 2026-05-27
1 pages